Markets · Renewables & storage

Transformers and storage for solar, wind and battery projects

Main power transformers for grid interconnection, 35 kV compact substations for collection, and integrated battery storage — for projects where equipment timing drives the commercial operation date.

What we supply

ScopeEquipmentTypical range
Grid interconnectionMain power transformers230 kV class, 40–300 MVA
CollectionCompact substations35 kV, 1–12.5 MVA; dry or oil
CollectionPad-mount transformers5–36 kV, to 5 MVA
StorageIntegrated storage units and PCS + MV skidsC&I to utility scale

Equipment timing and COD

On solar, wind and standalone storage projects, the main power transformer and collection equipment often sit on the critical path to commercial operation. Securing them early — with lead time confirmed in writing — protects the schedule and the interconnection milestones that depend on it.

What to include in a request

  • Project size (MW, and MWh for storage)
  • Point-of-interconnection voltage and grid code
  • Collector system voltage (for example 34.5 kV)
  • Inverter or PCS output voltage and block size
  • Single-line diagram, if available
  • Target commercial operation date and delivery destination